Tel: 845-795-5566                                          206 Milton Turnpike

Mobile: 914-490-8458                                    Milton, NY 12547

E: rtitanic@bortechinc.com

CONTACT US

ABOUT US                        SERVICES                

OUR HISTORY                                    HORIZONTAL DIRECTIONAL DRILLING (HDD)

OUR VALUES                                      JACK & BORE (J&B)

SAFETY                                               CONSENTRIC HAMMER SYSTEM (CHS)

                                                             GUIDED BORE METHOD (GBM)

PORTFOLIO                                SMALL BORING UNIT AUGER (SBU-A)

PROJECTS                                          MICROTUNNEL TUNNEL BORE MACHINE (MTBM)

                                                             CONSULTING

 

PIPE ROLLER RENTAL       CONTACT 

RENTALS                                            REQUEST A QUOTE                                                       

                                                            EMPLOYMENT OPPORTUNITIES
 

 

© 2017 COPYRIGHT. BORTECH INC. ALL RIGHTS RESERVED.

WESTCHESTER, NY

CATSKILL AQUADUCT PHASE 1 

Bortech was contracted to tunnel a 42-inch steel casing pipe through granite rock formation. Bortech chose the Small Boring Unit (SBU) Method for this project. Mainly due to the rock compressive strength was under 25,000 psi unconfined compressive strength. Bortech worked with the designer of the SBU in the 1980’s when they were on a project in Leesburg, VA.

IMG_4686