Bortech DTH Completed a 200' long 48" utility tunnel under the Sprain Brook Parkway. We encountered zones of boulders, cobbles and ledge rock.

PVC PIPES

BOSTON, MA
BROWNSFIELD SITE

National Grid Malden River Isolating Hazmat Soils. Pilot hole intercept to drill into surface casing to  Installing  Fusible PVC Twin Duct Bank Bundle.

HDD DIRECTIONAL DRILL

TAPPAN, NY
URBAN DRILL SITES

Con Edison hired Bortech for a design build to cross water channels and existing underground utilities.

BORTECH BORING MACHING

MOUNT VERNON, NY

American Water chose Bortech's DTH to cross under streams with boulders and cobbles along the bore path.