Basking Ridge, NJ-NJT
New Jersey American Water Utility Tunnel
Under New Jersey Transit Commuter Rail installed with Bortech Hammer System Through Volcanic Basalt Rock Formation.
Bortech Built Concentric Hammer completed a utility tunnel under NJ Transit Commuter Rail Line in 45,000 psi volcanic rock formation
Bortech built Horizontal Hammer completed a water tunnel for NJ American Water in Baskin g Ridge NJJ.
2018
Completion of Dutchess Country Airport using Horizontal Directional Drilling Maxi-Rig
Bortech successfully completed the Dutchess County 24 in. water main installation located from Dutchess Country Railtrail to the Dutchess County Airport. 2016
FEATURED PROJECTS __
2 0 1 7
Bortech INC. CEO Robert Titanic featured in Trenchless Technology Special Edition Newsletter
CEO Robert Titanic featured in Trenchless Technology Special Edition Newsletter as the front story of the "First Small Boring Unit".
2016
2010
National Grid Malden River Electric Fusible PVC Twin Duct Bank Bundle performed on EPA Brownfield Real Property.
2008
Keyspan Energy 24 inch Gas Main Installed Through Rock Formation in Urban East Boston Mass.
2015
Orange and Rockland Utilities Auger Bore steel casing for electric duct bank under NYC Mass Transit Authority Port Jervis, NY Commuter Rail. Bortech installed a vertical steerable casing head to control the grade during installation.
01
04 / 26 / 2011
02
05 / 01 / 2017
Robins Manufacturing features Bortech in Trenchless Technology for their part in the SBU-A developement.