Tel: 845-795-5566                                          206 Milton Turnpike

Mobile: 914-490-8458                                    Milton, NY 12547

E: rtitanic@bortechinc.com

CONTACT US

ABOUT US                        SERVICES                

OUR HISTORY                                    HORIZONTAL DIRECTIONAL DRILLING (HDD)

OUR VALUES                                      JACK & BORE (J&B)

SAFETY                                               CONSENTRIC HAMMER SYSTEM (CHS)

                                                             GUIDED BORE METHOD (GBM)

PORTFOLIO                                SMALL BORING UNIT AUGER (SBU-A)

PROJECTS                                          MICROTUNNEL TUNNEL BORE MACHINE (MTBM)

                                                             CONSULTING

 

PIPE ROLLER RENTAL       CONTACT 

RENTALS                                            REQUEST A QUOTE                                                       

                                                            EMPLOYMENT OPPORTUNITIES
 

 

© 2017 COPYRIGHT. BORTECH INC. ALL RIGHTS RESERVED.

1/18

Bortech Built Concentric Hammer completed a utility tunnel under NJ Transit Commuter Rail Line in 45,000 psi volcanic rock formation

 

Bortech built Horizontal Hammer completed a water tunnel for NJ American Water in Baskin g Ridge NJJ.

2018

Link

Completion of Dutchess Country Airport using Horizontal Directional Drilling Maxi-Rig

Bortech successfully completed the Dutchess County 24 in. water main installation located from Dutchess Country Railtrail to the Dutchess County Airport. 2016

Bortech INC. CEO Robert Titanic  featured in Trenchless Technology Special Edition Newsletter

 

CEO Robert Titanic featured in Trenchless Technology Special Edition Newsletter as the front story of the "First Small Boring Unit". 

2016

Link

FEATURED PROJECTS               __

2 0 1 7

Basking Ridge, NJ-NJT

New Jersey American Water Utility Tunnel 

Under New Jersey Transit Commuter Rail installed with Bortech Hammer System Through Volcanic Basalt Rock Formation.

2010

National Grid Malden River Electric Fusible PVC Twin Duct Bank Bundle performed on EPA Brownfield Real Property.

2008

Keyspan Energy 24 inch Gas Main Installed Through Rock Formation in Urban East Boston Mass.

2015

Orange and Rockland Utilities Auger Bore steel casing for electric duct bank under NYC Mass Transit Authority Port Jervis, NY Commuter Rail. Bortech installed a vertical steerable casing head to control the grade during installation.

01

04   /   26   /   2011

02

05   /   01   /   2017

Robins Manufacturing features Bortech in Trenchless Technology for their part in the SBU-A developement.

Link 

BORTECH INC. NEWS