Tel: 845-795-5566                                          206 Milton Turnpike

Mobile: 914-490-8458                                    Milton, NY 12547

E: rtitanic@bortechinc.com

CONTACT US

ABOUT US                        SERVICES                

OUR HISTORY                                    HORIZONTAL DIRECTIONAL DRILLING (HDD)

OUR VALUES                                      JACK & BORE (J&B)

SAFETY                                               CONSENTRIC HAMMER SYSTEM (CHS)

                                                             GUIDED BORE METHOD (GBM)

PORTFOLIO                                SMALL BORING UNIT AUGER (SBU-A)

PROJECTS                                          MICROTUNNEL TUNNEL BORE MACHINE (MTBM)

                                                             CONSULTING

 

PIPE ROLLER RENTAL       CONTACT 

RENTALS                                            REQUEST A QUOTE                                                       

                                                            EMPLOYMENT OPPORTUNITIES
 

 

© 2017 COPYRIGHT. BORTECH INC. ALL RIGHTS RESERVED.

CANMIN, MN

TRANS CONTINENTIAL PIPLINE: CANADA TO MN

BORTECH was contracted for horizontal directional drill crossings as part of a trans-continental pipeline project from Canada to Minnesota. Here we drilled under an environmentally designated river and worked closely with the environmental governing agencies.

 

BORTECH employed their expertise and unwavering respect for the environment. We believe that a mission statement backed by education and experience delivered to our clients with complete transparency is the platform to procedurally mitigate any possible field scenario.